Sunday, November 3, 2019

The metal frame for the walls and roof of Amidado (Amida Hall) of Amidaji temple

the metal frame of Amidado (finished)
CLICK HERE TO READ ABOUT THE NEW UPGRADES AT THE TEMPLE 

I finished the metal frame for the walls and roof of Amidado (Amida Hall). The worker said that a metal frame, although very expansive, is better than a wooden frame, and I listened to his advice.

So, I spent around 1200 euros in total for these metal bars and the worker pay. In the photos, you can see the result.
The next steps are to build the roof and the walls. There will be double wooden walls filled with glass wool insulation and covered with another thermal insulation on the outside. I also need to add
the metal frame of Amidado (finished)
two windows and a big entrance door. Materials for the walls and worker pay are surely arround 1500 euros or more (sorry, last time I miscalculated again the costs for the walls). The materials and worker payment for the roof will be arround 750 euros. I will try to first build the roof and then the walls.

Please help if you can. Any little amount is useful and very much needed.

Click here if you wish to donate via PayPal


the metal frame of Amidado (finished)
the metal frame of Amidado (finished)
or on this link, http://amida-ji-retreat-temple-romania.blogspot.com/p/donation.html if you wish to use other methods. The names of donors and/or the names of those in whose name the donation is made (no matter the amount) will be included in the dedication list of my new book.

NAMO AMIDA BU 



0 comentarii:

Dharma talks on my youtube channel